The installation rebate can help cover the costs of purchasing and installing eligible bidirectional charging equipment required for the Demonstration. Â
Eligible expenses include:Â
1 qualifying bidirectional charging system per customer/address, including but not limited to: Â
Bidirectional chargerÂ
InverterÂ
Transfer switchÂ
Disconnect switchÂ
Black start batteryÂ
Electrical upgrades needed to support the installation of the qualifying bidirectional charging system, including:Â Â
Permits and inspections required for the installation of eligible equipmentÂ
Labor performed by an approved, licensed electrician participating in the Demonstration, including time spent on design, permitting, and project management.
Expenses considered ineligible for the up-front installation rebate include, but are not limited to:
The purchase or lease of an electric vehicleÂ
Ongoing subscription, software, or service fees Â
Costs associated with installing stationary energy storage or photovoltaic (solar) systemsÂ
Any other equipment not required for bidirectional charging functionality Â
GM equipment outside of the required bidirectional system (GM Energy V2H Bundle)Â
Note: All rebates and rewards are subject to Demonstration requirements, available funding, and program eligibility rules.Â